China FRP Gutters Making Machine - Automated Suppliers for High-Quality GRP Gutter Production Factory
Key Parameters (Standard Model)
| Parameter Category | Detailed Value | Additional Notes |
|---|---|---|
| Model Number | DN1500-G | |
| Machine Dimensions | 64m(L)×4m(W)×5 m(H) | Can be adjusted to meet specific requirements |
| Machine Weight | Approximately 20,000 kg | Heavy-duty steel frame ensures stable and reliable operation |
| Power Requirement | 380V | Compatible with industrial three-phase power supply |
| Production Rate | 4–10 meters per minute | Adjustable based on product thickness |
| Suitable Plates | Flat sheet → Formed gutter | One-step forming process, no secondary processing needed |
| Sheet Specifications | Max effective width 1500 mm; Thickness 0.4–4 mm; Corrugation height ≤380 mm | Meets the size needs of most mainstream gutter applications |
| Labor Requirement | 5-8 workers per shift | PLC control system, only manual monitoring required |
| Warranty Period | 1 year | Covers core components and professional technical support |
1. Raw Material System
This system is compatible with glass fiber materials (including chopped strand mats and fiberglass roving) and resin systems (unsaturated polyester and accelerate). Equipped with a fiberglass frame, resin tank, and metering pump(Split pump), it precisely regulates fiber and resin content , thereby control frp gutter’s strength and corrosion resistance.


2. Infiltration platform
The Infiltration platform is crucial for sheet quality—it enables effective resin Infiltration to prevent glass fiber leakage, ensuring superior sheet quality,and it avoid that the resin is too viscous to receive impregnation in winter and contribute to increase production speed and impregnation in summer; PID temperature control system: accurate temperature control



3. Control System
Featuring PLC + touch screen operation, this system allows for presetting of production speed, heating oven ‘s temperature, and forming parameters. It also supports fixed-length cutting to minimize material waste and is compatible with remote technical support for quick troubleshooting.


Cutting

Key Competitive Advantages
Common Application
Delivery and After-sales Service
The standard configuration includes the main machine, control system, raw material supply unit, and cutting device. The entire machine is fully debugged after deliver to factory, and inspection video can be provided for clients.
We offer free supply of wearing parts for 1 year and lifelong technical support. Professional engineers for overseas on-site installation, debugging and one-on-one operator training (until independent operation).
Delivery time: Approximately 50–60 days for 1 unit, 65–90 days for 2 units. Urgent delivery can be negotiated for bulk orders.





























